{"id":2622,"date":"2023-11-29T10:04:22","date_gmt":"2023-11-29T15:04:22","guid":{"rendered":"https:\/\/acemaingenieria.com\/?p=2622"},"modified":"2023-11-30T10:41:07","modified_gmt":"2023-11-30T15:41:07","slug":"construccion-ampliacion-subestacion-urra","status":"publish","type":"post","link":"https:\/\/acemaingenieria.com\/en\/construccion-ampliacion-subestacion-urra\/","title":{"rendered":"Urr\u00e1 Substation Expansion Construction"},"content":{"rendered":"","protected":false},"excerpt":{"rendered":"<p>It encompasses the 60LHA005JD cell suitability located in the 34,5 kV train in Urr\u00e1 substation. This cell will be the networking point of 19,9MWp Urr\u00e1 solar park. This Project also includes the communication system definition between the substation and the solar park.<\/p>","protected":false},"author":1,"featured_media":2685,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","inline_featured_image":false,"footnotes":""},"categories":[10],"tags":[],"class_list":["post-2622","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-proy-destacados"],"_links":{"self":[{"href":"https:\/\/acemaingenieria.com\/en\/wp-json\/wp\/v2\/posts\/2622","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/acemaingenieria.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/acemaingenieria.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/acemaingenieria.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/acemaingenieria.com\/en\/wp-json\/wp\/v2\/comments?post=2622"}],"version-history":[{"count":1,"href":"https:\/\/acemaingenieria.com\/en\/wp-json\/wp\/v2\/posts\/2622\/revisions"}],"predecessor-version":[{"id":2623,"href":"https:\/\/acemaingenieria.com\/en\/wp-json\/wp\/v2\/posts\/2622\/revisions\/2623"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/acemaingenieria.com\/en\/wp-json\/wp\/v2\/media\/2685"}],"wp:attachment":[{"href":"https:\/\/acemaingenieria.com\/en\/wp-json\/wp\/v2\/media?parent=2622"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/acemaingenieria.com\/en\/wp-json\/wp\/v2\/categories?post=2622"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/acemaingenieria.com\/en\/wp-json\/wp\/v2\/tags?post=2622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}